Stereo Integrity BM pre-order: almost $100 off each!
Hope you guys dont mind me posting these over here. Im a moderator over on the Lexus IS forums and one of the guys over there is building these enclosures for the SI BM's. Nick has already seen it because he posts over there but i thought it was too cool not to show over here.
It shows how small of an enclosure these can really go in. This was design for the IS300 spare tire. Not the spare tire well but the actual spare tire! No removal of the tire at all just drop this in and listen to it. Its so small the enclosure and sub fit into the factory box!



It shows how small of an enclosure these can really go in. This was design for the IS300 spare tire. Not the spare tire well but the actual spare tire! No removal of the tire at all just drop this in and listen to it. Its so small the enclosure and sub fit into the factory box!
Youtube videos cannot reproduce SQ, but I'm building my temp. boxes this weekend if the rain clears so I'll get you something.
For those still interested in getting a great deal on the BM, the 2nd pre-order is now open.
Originally Posted by Stereo Integrity
As promised, the next pre-order for the BM mkIII subwoofers is now open. We are working as hard as possible to get the BM mkIII's ready for shipment, but to ensure that we keep everything safe, we have a disclaimer that it may take 60 days for shipment on the pre-ordering page.
Shipping is calculated through our shopping cart for those of you who are located in the lower 48 states. For shipping outside of the lower 48 United States, please email me at nick@stereointegrity.com so that you can get a shipping quote.
The site where you can place your order is here, http://stereointegrity.com/index.php?id=57
I will keep everyone abreast on any new information and/or progress on the BM mkIII's through our newsletter, so keep your eyes on your email inbox!
Thanks,
Nick Lemons
Shipping is calculated through our shopping cart for those of you who are located in the lower 48 states. For shipping outside of the lower 48 United States, please email me at nick@stereointegrity.com so that you can get a shipping quote.
The site where you can place your order is here, http://stereointegrity.com/index.php?id=57
I will keep everyone abreast on any new information and/or progress on the BM mkIII's through our newsletter, so keep your eyes on your email inbox!
Thanks,
Nick Lemons
Here is Nick's most recent update as of 5/28/2010
Originally Posted by Stereo Integrity
Hi everyone,
It's been a while since our last update on the BM mkIII subwoofers, so here is another update.
The BM mkIII's still aren't ready for shipment quite yet. All of the moving parts and metal parts are ready for assembly, but the one thing that is holding us back is the neodymium. The availability of neo has continued to become more and more of a problem of the past year or so. And it is the lack of availability of neodymium that has pushed back the production of this current batch of BM mkIII subwoofers.
We are expecting the neo motors to come back from the magnetizer by the end of this next week so we can begin placing the motors inside the baskets and completing the assembly of the subwoofers by the end of this next month.
I will be sending out another newsletter early next month letting you when we receive the motors and how production is shaping up.
Thanks for your patience!
Nick Lemons
www.stereointegrity.com
It's been a while since our last update on the BM mkIII subwoofers, so here is another update.
The BM mkIII's still aren't ready for shipment quite yet. All of the moving parts and metal parts are ready for assembly, but the one thing that is holding us back is the neodymium. The availability of neo has continued to become more and more of a problem of the past year or so. And it is the lack of availability of neodymium that has pushed back the production of this current batch of BM mkIII subwoofers.
We are expecting the neo motors to come back from the magnetizer by the end of this next week so we can begin placing the motors inside the baskets and completing the assembly of the subwoofers by the end of this next month.
I will be sending out another newsletter early next month letting you when we receive the motors and how production is shaping up.
Thanks for your patience!
Nick Lemons
www.stereointegrity.com
Port it first... if you still need more then move up to the BMs.



