Never Again...!
HI!... All I use is ONE 3/8 rachet, ONE 6" 3/8 EXTENSION, ONE 3" 3/8 EXTENSION, a sparkplug socket, and a 1/4 drive rachet with a 7MM socket. THAT'S IT!!!!!!!
I can get all 4 plugs out on the P/S in like 3 minutes. D/S takes about 10 minutes due to I have to remove the fuel rail. Once I get my custom fuel rails installed I will no longer have to remove it. Then I'll be looking at the 15MINUTE plug chane on the 5.4! LOL!
I can get all 4 plugs out on the P/S in like 3 minutes. D/S takes about 10 minutes due to I have to remove the fuel rail. Once I get my custom fuel rails installed I will no longer have to remove it. Then I'll be looking at the 15MINUTE plug chane on the 5.4! LOL!


