Tracking request: RyPow's 2012 Screw XLT

Thread Tools
 
Search this Thread
 
Old Feb 27, 2012 | 03:17 PM
  #31  
RyPow's Avatar
Thread Starter
|
Member
Joined: Jan 2012
Posts: 50
Likes: 0
From: Guelph, Ontario, Canada
My truck's rail journey is complete - the railcar was "constructively placed" (according to Norfolk Southern) in the Toronto Yard just after 3pm today. The ETA of March 5 must either be very conservative, or it is going to take the truck 7 days to make a 1-hour drive. Fingers crossed for a speedy loading onto the car hauler!
 
Reply
Old Feb 27, 2012 | 05:08 PM
  #32  
acanaman's Avatar
Member
Joined: Jan 2012
Posts: 83
Likes: 0
From: Kelowna, BC, Canada
Yay! Mine is doing what yours did now, it was built a week ago but seems to be sitting waiting to be loaded onto the train. Don't forget to post some pics! I wonder if it was a Norfolk engine that pulled it the whole way or if a CN engine did some work too.
 
Reply
Old Feb 27, 2012 | 05:15 PM
  #33  
SETCHAN's Avatar
Build Tracking Moderator
Joined: Aug 2009
Posts: 5,403
Likes: 0
Passing (Canadian National Railways ) Braintter, ON Feb-27-2012, 13:42 ET Mar-05-2012
 
Reply
Old Feb 28, 2012 | 09:57 AM
  #34  
RyPow's Avatar
Thread Starter
|
Member
Joined: Jan 2012
Posts: 50
Likes: 0
From: Guelph, Ontario, Canada
Originally Posted by SETCHAN
Passing (Canadian National Railways ) Braintter, ON Feb-27-2012, 13:42 ET Mar-05-2012
Braintter, ON = Brampton Intermodal Terminal (Brampton, Ontario)
 
Reply
Old Feb 28, 2012 | 11:08 AM
  #35  
RyPow's Avatar
Thread Starter
|
Member
Joined: Jan 2012
Posts: 50
Likes: 0
From: Guelph, Ontario, Canada
Originally Posted by acanaman
Yay! Mine is doing what yours did now, it was built a week ago but seems to be sitting waiting to be loaded onto the train. Don't forget to post some pics! I wonder if it was a Norfolk engine that pulled it the whole way or if a CN engine did some work too.
There will be plenty of pictures when my truck gets here! Don't fret about the delay, seems normal that some trucks spend time in the lot waiting for a shipment to the right area.

Norfolk Southern's tracking listed an "interchange" at Chicago. It could very well have been CN power from that point on, although I see CN trains here all the time with locomotives from BNSF, Santa Fe etc.

The railcar is "Bad Ordered" in the Toronto Yard, which from a quick search seems like an issue with the rolling stock, not the shipment (I sure hope so anyway). I really hope they have no issues unloading the vehicles first and addressing the failed railcar inspection second.
 
Reply
Old Feb 28, 2012 | 04:23 PM
  #36  
SETCHAN's Avatar
Build Tracking Moderator
Joined: Aug 2009
Posts: 5,403
Likes: 0
Delay- Conveyance Mechanical Failure (Canadian National Railways ) Tormacyar, ON Feb-27-2012, 23:24 ET Mar-05-2012
 
Reply
Old Feb 28, 2012 | 04:29 PM
  #37  
RyPow's Avatar
Thread Starter
|
Member
Joined: Jan 2012
Posts: 50
Likes: 0
From: Guelph, Ontario, Canada
Originally Posted by SETCHAN
Delay- Conveyance Mechanical Failure (Canadian National Railways ) Tormacyar, ON Feb-27-2012, 23:24 ET Mar-05-2012
Just what I expected. Get on that, CN! I wonder what would hold it up in the yard. Better just be a faulty door or something.

Tormacyar = Toronto MacMillan Yard (largest rail yard in Canada)
 

Last edited by RyPow; Feb 28, 2012 at 04:33 PM.
Reply
Old Feb 28, 2012 | 04:30 PM
  #38  
SETCHAN's Avatar
Build Tracking Moderator
Joined: Aug 2009
Posts: 5,403
Likes: 0
Originally Posted by RyPow
Just what I expected. Get on that, CN!

Tormacyar = Toronto MacMillan Yard (largest rail yard in Canada)
you have a list of the yard's names?

USA too?
 
Reply
Old Feb 28, 2012 | 04:32 PM
  #39  
acanaman's Avatar
Member
Joined: Jan 2012
Posts: 83
Likes: 0
From: Kelowna, BC, Canada
There's a reasonable sized list here:

http://www.haya.qc.ca/cn-yards.htm
 
Reply
Old Feb 28, 2012 | 04:41 PM
  #40  
SETCHAN's Avatar
Build Tracking Moderator
Joined: Aug 2009
Posts: 5,403
Likes: 0
Originally Posted by acanaman
There's a reasonable sized list here:

http://www.haya.qc.ca/cn-yards.htm
Thanks
 
Reply
Old Feb 28, 2012 | 04:43 PM
  #41  
RyPow's Avatar
Thread Starter
|
Member
Joined: Jan 2012
Posts: 50
Likes: 0
From: Guelph, Ontario, Canada
Originally Posted by SETCHAN
you have a list of the yard's names?

USA too?
No, I'm just OCD and looked up the different yards in the Toronto area. I recognized the names in the abbreviations your tracking information provides. That list that acanaman posted is a good reference!.
 

Last edited by RyPow; Feb 28, 2012 at 04:46 PM.
Reply
Old Feb 29, 2012 | 03:41 PM
  #42  
SETCHAN's Avatar
Build Tracking Moderator
Joined: Aug 2009
Posts: 5,403
Likes: 0
no change
 
Reply
Old Mar 1, 2012 | 09:56 AM
  #43  
RyPow's Avatar
Thread Starter
|
Member
Joined: Jan 2012
Posts: 50
Likes: 0
From: Guelph, Ontario, Canada
Railcar tracking updated 4:04am today, still "Bad Ordered". Let's get those trucks off the crippled autorack please!
 
Reply
Old Mar 1, 2012 | 03:46 PM
  #44  
RyPow's Avatar
Thread Starter
|
Member
Joined: Jan 2012
Posts: 50
Likes: 0
From: Guelph, Ontario, Canada
Setchan, could you check for any updates (In Transit, 1FTVW1EF1CKD46705)? Thanks!
 

Last edited by RyPow; Mar 1, 2012 at 03:55 PM. Reason: added VIN
Reply
Old Mar 1, 2012 | 04:46 PM
  #45  
SETCHAN's Avatar
Build Tracking Moderator
Joined: Aug 2009
Posts: 5,403
Likes: 0
Delay- Conveyance Mechanical Failure (Canadian National Railways ) Tormacyar, ON Mar-01-2012, 04:04 ET Mar-05-2012
 